Lakhami HPP-1

Tyrolean type intake
3.8 km of GRP and Steel pipe
6.4 MW surface powerhouse
32.2 GWH annual generation

ჰესის შენობა

Lakhami HPP-2

Tyrolean type intake
4.5 km of GRP and Steel pipe
9.5 MW surface powerhouse
47.7 GWH annual generation

tangent-towers-mountains-high-vo

Connection to the Grid

35 kV (35 kV side of double circuit 110/35 kV) overhead transmission line connects the Lakhami HPP-2 to the national grid of Georgia through Sagergila substation. Lakhami HPP-1 connected to Lakhami HPP-2, through double circuit 10 kV underground cable and further to national grid